-Gas sweetening unit
-Nitrogen Package
-Raw gas compression
-Dehydration Facilities
Engineering Analysis of system comprising of vessels.
It includes Regenerator, BFAH, orface chamber, TPSV(Triple Port
Side Value), Duct piping for designing of spring.
Support @BPCL KR
Detailed engineering analysis for units in androth island.
Engineering analysis for COPT Jetty to willington island terminal.
Requirement: All document PESO Aproval
Calculation of entire route in Q4 project
Designing Engineering analysis for units supplying ATF from BPCL KR to CIAL (Cochin International Airport) Design of pumphouse, tank units, pressure vessels & design of underground lines HDD where included.
IOCL Kawaratti pipeline from recipt manfold inside the depo to delivery point at the jetty used for recipt & delivery of product.